Progress Toward Our Goal
- Committed
- $885,212
- Of $600K goal
- 148%
- Remaining to goal
- $0
- 1. $60K — Fellowship Program & Church Planting
- 2. $600K — Building Savings Fund
- 3. $650K — Playground / Courtyard
What’s Been Done, and What Is Planned
Building Improvements
April 2026
Easter Flood Response
Complete
Pump rentals, carpet remediation, and emergency supplies to defend the building against major rainfall and a city sewer backup event.
May 2026
HVAC Unit Replacements
Complete
Installed two new HVAC units serving the back hallway, rooms, and Chapel.
Cost: $53,720
June 2026
Wetlands Clearing
Complete
Removing felled trees and brush from the wetlands area. Will improve water retention capacity, sightlines into the woods for safety, and reduce wildlife and insect concerns.
Cost: $1,700
June 2026
Manual Sewer Isolation Valve
In Progress
Allows us to temporarily isolate the church from the city sewer system when East Lansing’s system is over capacity, preventing backflow into the building.
June–August 2026
Drainage Strategy & Permitting
In Progress
Initial surveying and contractor proposals for new drainage strategies and required permitting.
Cost: ~$20,000
July–August 2026
Basement Mop Sink Closet
In Progress
Addressing a known vulnerability: breaking up concrete to investigate a leak, installing a sump well and pump, and possibly adding a shutoff valve.
Cost: ~$6,000
2027–2028
Courtyard / Playground
Planned
Turning an underused stretch of our grounds into a welcoming outdoor space for conversation, coffee, and kids at play.
Cost: $75,000
Potential Spending Next Decade
Upcoming Improvements & Maintenance
All items are best estimates and will change in both cost and timing. Our orientation is toward prudent maintenance and extending the life of our systems as long as we can without undue risk or any threat to the safety of our occupants.
Next 1–2 Years
Flood Prevention
~$50,000–$100,000
Handicap ramp at front entrance and covered walkway over Children’s Wing entrance
Building a covered walkway to provide a better experience for members being dropped off — especially in rain or snow. Possibly an incorporated bike rack.
Installing a handicap ramp to provide an accessible entrance for guests in wheelchairs, walkers, or for whom stairs are a challenge.
~$120,000
Elevator Upgrade & Code Compliance
A mandatory state-required update due in 2027.
~$27,000
Courtyard / Playground
Turning an underused stretch of our grounds into a welcoming outdoor space for conversation, coffee, and kids at play.
$75,000
HVAC
Emergency and unanticipated equipment replacement.
~$75,000
2–5 Years
Carpet Replacement
Likely batched into phases: (1) Sanctuary, (2) Foyer and Fellowship Hall, (3) Chapel.
~$140,000
HVAC Units
Contingent on unit failures. The sanctuary unit is likely next in line.
~$100,000
Lighting
~$50,000
5–10 Years and Beyond
Roof — Membrane
Replacing the EPDM rubber membrane roof covering most of the building. Likely executable in 3 phases or sections.
~$350,000
Asphalt / Parking Lots
Both lots will eventually need re-grinding. The main west lot also needs re-grading for better water management and new light pole installation.
Kitchen
Roof — Shingle
Pledge to Building for Tomorrow
The online pledge form remains open for those