Building for Tomorrow

Campaign Progress and Planning

A three-year campaign (July 2026 – July 2029) investing in URC’s building and the Fellowship Program.

Progress Toward Our Goal

$0$650,000 stretch goal
Committed
$885,212
Of $600K goal
148%
Remaining to goal
$0
  1. 1. $60K — Fellowship Program & Church Planting
  2. 2. $825K+ — Building Savings Fund + Playground
Make a pledge

What’s Been Done, and What Is Planned

Building & Property Activity and Improvements

  1. April 2026

    Easter Flood Response

    Complete

    Pump rentals, carpet remediation, and emergency supplies to defend the building against major rainfall and a city sewer backup event.

    Volunteers running water pumps beside the church after floodwater covered the walkway and grounds.
    View from the church porch of utility equipment standing in brown floodwater during heavy rain.

    Photo 1 of 2

  2. May 2026

    HVAC Unit Replacements

    Complete

    Installed two new HVAC units serving the back hallway, rooms, and Chapel.

    Cost: $53,720

    A crane lifting a rooftop HVAC unit into place at University Reformed Church.
  3. June 2026

    Church Work Day: Brush clean up

    Complete

    Removing felled trees and brush from the woodlands around the church. Improved water retention capacity, sightlines into the woods for safety, and reduced wildlife and insect concerns.

    Cost: $1,700

    A tractor feeding brush into a wood chipper at the edge of the woods during the wetlands clearing work day.
    Trucks and trailers staged in the church parking lot for the wetlands clearing work day.
    A skid steer, wood chipper, and trailer of branches clearing brush along the tree line.
    A trailer filled with wood chips beside the chipper after wetlands clearing.

    Photo 1 of 4

  4. June–November 2026

    Drainage Strategy & Permitting

    In Progress

    Initial surveying and contractor proposals for new drainage strategies and required permitting.

    Cost: ~$20,000

    Reviewing drainage and site plans spread across an outdoor table.
  5. July–October 2026

    Basement Mop Sink Closet

    In Progress

    Addressing a known vulnerability: breaking up concrete to investigate a leak, installing a sump well and pump, and possibly adding a shutoff valve.

    Cost: ~$8,000

    Basement mop sink closet with the concrete floor removed, gravel exposed, and a sump pump installed.
  6. September 2026

    Office Wing Ground Water Management

    Complete

    Continued efforts to remove water-retentive materials to install a permeable system which will prevent water damage to the office wing.

    Cost: $6,000

    An excavator digging along the brick office wing beside a dump truck, with ornamental grasses in the foreground.
  7. September 2026–May 2027

    Front Entrance Handicap Ramp

    Planned

    Installing a handicap ramp to provide an accessible entrance for guests in wheelchairs, walkers, or for whom stairs are a challenge.

    Cost: $60,000–$90,000

    “Rough conceptual rendering — incline and path are approximate and not final.”
    Early rendering of a landscaped walkway with benches along the Children’s Wing, leading toward the church entrance.
  8. September 2026–May 2027

    Covered Walkway on Children’s Wing Entrance

    Planned

    Building a covered walkway to provide better safety and comfort for people using this entrance and drop-off point. Likely to include a bike rack, bench seating, and panels that can cover the walkway sides in the winter.

    Cost: $70,000–$90,000

    Early rendering of a covered, level front entrance with accessible parking spaces.
  9. October 2026–June 2027

    Courtyard / Playground — Phase 1

    Planned

    Turning an underused stretch of our grounds into a welcoming outdoor space for conversation, coffee, and kids at play. Phase 1: finalizing the plan, drainage work and grading, tree planting, concrete pour, tables and chairs, electrical, and possibly a swing set.

    Cost: $50,000–$75,000

    Site plan of the courtyard and playground: a fenced open lawn west of a concrete patio beside the Children’s Wing, with notes for drainage, lighting, and a future shed.
  10. July 2027–July 2028

    Courtyard / Playground — Phase 2

    Planned

    Installation of permanent play structures and mulch / rubber surfacing, fencing, final tree planting, and landscaping.

    Cost: $75,000–$100,000

    Courtyard patio with tables, chairs, and umbrellas, looking west toward the playground.
    Playground with slides, swings, sandbox, and climbing boulders, looking west.
    Playground and courtyard looking north, with play equipment in the foreground and patio seating by the building.

    Photo 1 of 3

  11. Date TBD

    Courtyard / Playground — Phase 3

    Planned

    Pouring a concrete walkway from the fence gate to the end of the Children’s Wing and to the parking lot. Possible storage shed. Additional small, single-purpose playground equipment, such as a spinner or climbing structure.

Potential Spending Next Decade

Upcoming Improvements & Maintenance

All items are best estimates and will change in both cost and timing. Our orientation is toward prudent maintenance and extending the life of our systems as long as we can without undue risk or any threat to the safety of our occupants.

Next 1–2 Years

  • Flood Prevention

    ~$50,000–$100,000

  • Front Entrance Handicap Ramp

    September 2026–May 2027. Installing a handicap ramp to provide an accessible entrance for guests in wheelchairs, walkers, or for whom stairs are a challenge.

    $60,000–$90,000

  • Covered Walkway on Children’s Wing Entrance

    September 2026–May 2027. Building a covered walkway to provide better safety and comfort for people using this entrance and drop-off point. Likely to include a bike rack, bench seating, and panels that can cover the walkway sides in the winter.

    $70,000–$90,000

  • Elevator Upgrade & Code Compliance

    A mandatory state-required update due in 2027.

    ~$27,000

  • Courtyard / Playground — Phase 1

    October 2026–June 2027. Finalizing the plan, drainage work and grading, tree planting, concrete pour, tables and chairs, electrical, and possibly a swing set.

    $50,000–$75,000

  • Courtyard / Playground — Phase 2

    July 2027–July 2028. Installation of permanent play structures and mulch / rubber surfacing, fencing, final tree planting, and landscaping.

    $75,000–$100,000

  • Courtyard / Playground — Phase 3

    Date TBD. Pouring a concrete walkway from the fence gate to the end of the Children’s Wing and to the parking lot. Possible storage shed. Additional small, single-purpose playground equipment, such as a spinner or climbing structure.

  • HVAC

    Emergency and unanticipated equipment replacement.

    ~$75,000

2–5 Years

  • Carpet Replacement

    Likely batched into phases: (1) Sanctuary, (2) Foyer and Fellowship Hall, (3) Chapel.

    ~$140,000

  • HVAC Units

    Contingent on unit failures. The sanctuary unit is likely next in line.

    ~$100,000

  • Lighting

    ~$50,000

5–10 Years and Beyond

  • Roof — Membrane

    Replacing the TPO rubber membrane roof covering most of the building. Likely executable in 3 phases or sections.

    ~$350,000

  • Asphalt / Parking Lots

    Both lots will eventually need re-grinding. The main west lot also needs re-grading for better water management and new light pole installation.

  • Kitchen

  • Roof — Shingle

Pledge to Building for Tomorrow

The online pledge form remains open for those
who still want to give toward this work.

Make a pledge