Progress Toward Our Goal
- Committed
- $885,212
- Of $600K goal
- 148%
- Remaining to goal
- $0
- 1. $60K — Fellowship Program & Church Planting
- 2. $825K+ — Building Savings Fund + Playground
What’s Been Done, and What Is Planned
Building & Property Activity and Improvements
April 2026
Easter Flood Response
Complete
Pump rentals, carpet remediation, and emergency supplies to defend the building against major rainfall and a city sewer backup event.
May 2026
HVAC Unit Replacements
Complete
Installed two new HVAC units serving the back hallway, rooms, and Chapel.
Cost: $53,720
June 2026
Church Work Day: Brush clean up
Complete
Removing felled trees and brush from the woodlands around the church. Improved water retention capacity, sightlines into the woods for safety, and reduced wildlife and insect concerns.
Cost: $1,700
June–November 2026
Drainage Strategy & Permitting
In Progress
Initial surveying and contractor proposals for new drainage strategies and required permitting.
Cost: ~$20,000
July–October 2026
Basement Mop Sink Closet
In Progress
Addressing a known vulnerability: breaking up concrete to investigate a leak, installing a sump well and pump, and possibly adding a shutoff valve.
Cost: ~$8,000
September 2026
Office Wing Ground Water Management
Complete
Continued efforts to remove water-retentive materials to install a permeable system which will prevent water damage to the office wing.
Cost: $6,000
September 2026–May 2027
Front Entrance Handicap Ramp
Planned
Installing a handicap ramp to provide an accessible entrance for guests in wheelchairs, walkers, or for whom stairs are a challenge.
Cost: $60,000–$90,000
“Rough conceptual rendering — incline and path are approximate and not final.” September 2026–May 2027
Covered Walkway on Children’s Wing Entrance
Planned
Building a covered walkway to provide better safety and comfort for people using this entrance and drop-off point. Likely to include a bike rack, bench seating, and panels that can cover the walkway sides in the winter.
Cost: $70,000–$90,000
October 2026–June 2027
Courtyard / Playground — Phase 1
Planned
Turning an underused stretch of our grounds into a welcoming outdoor space for conversation, coffee, and kids at play. Phase 1: finalizing the plan, drainage work and grading, tree planting, concrete pour, tables and chairs, electrical, and possibly a swing set.
Cost: $50,000–$75,000
July 2027–July 2028
Courtyard / Playground — Phase 2
Planned
Installation of permanent play structures and mulch / rubber surfacing, fencing, final tree planting, and landscaping.
Cost: $75,000–$100,000
Date TBD
Courtyard / Playground — Phase 3
Planned
Pouring a concrete walkway from the fence gate to the end of the Children’s Wing and to the parking lot. Possible storage shed. Additional small, single-purpose playground equipment, such as a spinner or climbing structure.
Potential Spending Next Decade
Upcoming Improvements & Maintenance
All items are best estimates and will change in both cost and timing. Our orientation is toward prudent maintenance and extending the life of our systems as long as we can without undue risk or any threat to the safety of our occupants.
Next 1–2 Years
Flood Prevention
~$50,000–$100,000
Front Entrance Handicap Ramp
September 2026–May 2027. Installing a handicap ramp to provide an accessible entrance for guests in wheelchairs, walkers, or for whom stairs are a challenge.
$60,000–$90,000
Covered Walkway on Children’s Wing Entrance
September 2026–May 2027. Building a covered walkway to provide better safety and comfort for people using this entrance and drop-off point. Likely to include a bike rack, bench seating, and panels that can cover the walkway sides in the winter.
$70,000–$90,000
Elevator Upgrade & Code Compliance
A mandatory state-required update due in 2027.
~$27,000
Courtyard / Playground — Phase 1
October 2026–June 2027. Finalizing the plan, drainage work and grading, tree planting, concrete pour, tables and chairs, electrical, and possibly a swing set.
$50,000–$75,000
Courtyard / Playground — Phase 2
July 2027–July 2028. Installation of permanent play structures and mulch / rubber surfacing, fencing, final tree planting, and landscaping.
$75,000–$100,000
Courtyard / Playground — Phase 3
Date TBD. Pouring a concrete walkway from the fence gate to the end of the Children’s Wing and to the parking lot. Possible storage shed. Additional small, single-purpose playground equipment, such as a spinner or climbing structure.
HVAC
Emergency and unanticipated equipment replacement.
~$75,000
2–5 Years
Carpet Replacement
Likely batched into phases: (1) Sanctuary, (2) Foyer and Fellowship Hall, (3) Chapel.
~$140,000
HVAC Units
Contingent on unit failures. The sanctuary unit is likely next in line.
~$100,000
Lighting
~$50,000
5–10 Years and Beyond
Roof — Membrane
Replacing the TPO rubber membrane roof covering most of the building. Likely executable in 3 phases or sections.
~$350,000
Asphalt / Parking Lots
Both lots will eventually need re-grinding. The main west lot also needs re-grading for better water management and new light pole installation.
Kitchen
Roof — Shingle